The tender was carried out EU-wide in an open procedure. The requirement of the district of Mühldorf am Inn was to purchase 100 % green electricity for the consumption points.
- Home
- /
- Category: References Energy Procurement
In order to replace the climate-damaging fuel lignite with CO2-free heat, the site managers decided to connect the plant to the local district heating network of N-Ergie. In addition to the conversion of the heat supply, several optimisation measures in the local heating network were also investigated in order to achieve the maximum CO2 savings.