The investigation of the internal energy flows has shown that due to the insufficient hydraulics of the existing heating network, the already existing waste heat recovery from the cooling water circuit of the oil refinery cannot be fully utilized. The greatest cost savings were achieved by the recommended conversion to natural gas instead of heating oil.
- Home
- /
- ArchiveReferences Energy Procurement
